Business model: (1) single private operator; (2) dual private actor; (3) public ownership, private operation; (4) fully public operator
Business model typology
Fully private operation
Public ownership, private operation
Publication year of the procurement process
Year
2019
2025
Institution responsible for issuing the procurement process.
Issuing authority
São Paulo Transporte S/A
Agência de Regulação e Controle dos Serviços Públicos de Transporte (Artran)
Language in which the procurement documents are available.
Language
Portuguese
Portuguese
Governance
Country name
Country
#SP
Brazil
#402
Brazil
City or metropolitan region where the procurement process applies.
City / Region
#SP
São Paulo
#402
Belém
Entity responsible for provision of bus fleet
Fleet provision
#SP
Private operator
#402
Public authority (operator must use publicly provided fleet)
Entity responsible for operating public transport services.
Operation
#SP
Private operator
#402
Private operator
Entity responsible for charging infrastructure deployment and operation.
Charging infrastructure
#SP
Private asset provider (i.e., energy as a service provider) installs under public financing
#402
Charging infrastructure (substations) installed by public authority in public terminals; charging equipment supplied via fleet procurement; operator responsible for operation/use
Entity responsible for terminals and depots (ownership, upgrades, or operation).
Terminal and depot
#SP
Private operator owns terminals and depots
#402
Provided by public authority
Entity responsible for fleet maintenance.
Maintenance
#SP
Operator responsible under fleet provider supervision
#402
Operator responsible for fleet maintenance; supplier provides technical support/training
Distribution of functional responsibilities among actors involved in the model.
Functional role distribution*
#SP
Fully integrated private model (private operator procures, owns and operates fleet)
#402
Unbundled public model
How electrification is phased or structured over time in the procurement design.
Electrification trajectory design*
#SP
Fully integrated private model (private operator procures, owns and operates fleet)
City or metropolitan region where the procurement process applies.
City / Region
São Paulo
Belém
Entity responsible for provision of bus fleet
Fleet provision
Private operator
Public authority (operator must use publicly provided fleet)
Entity responsible for operating public transport services.
Operation
Private operator
Private operator
Entity responsible for charging infrastructure deployment and operation.
Charging infrastructure
Private asset provider (i.e., energy as a service provider) installs under public financing
Charging infrastructure (substations) installed by public authority in public terminals; charging equipment supplied via fleet procurement; operator responsible for operation/use
Entity responsible for terminals and depots (ownership, upgrades, or operation).
Terminal and depot
Private operator owns terminals and depots
Provided by public authority
Entity responsible for fleet maintenance.
Maintenance
Operator responsible under fleet provider supervision
Operator responsible for fleet maintenance; supplier provides technical support/training
Distribution of functional responsibilities among actors involved in the model.
Functional role distribution*
Fully integrated private model (private operator procures, owns and operates fleet)
Unbundled public model
How electrification is phased or structured over time in the procurement design.
Electrification trajectory design*
Fully integrated private model (private operator procures, owns and operates fleet)
Unbundled public model
CAPEX Structure
Country name
Country
#SP
Brazil
#402
Brazil
City or metropolitan region where the procurement process applies.
City / Region
#SP
São Paulo
#402
Belém
Minimum fleet size and key vehicle specification requirements described in the procurement.
Minimum fleet size specifications
#SP
Not publicly available
#402
Not specified (defined in fleet procurement – ID 401)
How the procurement defines or requires the inclusion of electric vehicles (e.g., percentage of total fleet, categories affected)
Electric requirement
#SP
—
#402
—
Warranty requirements for vehicles, batteries, or systems when disclosed.
Warranty requirements
#SP
Not publicly available
#402
Not applicable to operation procurement
Main source of CAPEX payment or revenue in the contractual arrangement.
CAPEX payment or revenue source
#SP
Private operator, but SPTrans subsidizes a percentage equivalent to the difference in value between a diesel bus and an electric bus.
#402
Not applicable (CAPEX handled via separate fleet procurement)
CAPEX payment or revenue values and units disclosed in the procurement.
CAPEX payment or revenue values
#SP
Internal Rate of Return (IRR) of 9.1% on invested capital*
#402
Not applicable
How residual value risk of assets is allocated among stakeholders.
Asset residual value risk allocation*
#SP
Private fleet provider (inferred)
#402
Public authority (inferred)
How battery degradation risk is allocated among stakeholders.
Battery degradation risk allocation*
#SP
Private fleet provider (inferred)
#402
Public authority (inferred)
Primary source of financing for the fleet or infrastructure investments.
Source of financing*
#SP
Shared (private and public)
#402
Operator (inferred)
Currency denomination and risk-sharing structure for payments or contracts.
City or metropolitan region where the procurement process applies.
City / Region
São Paulo
Belém
Minimum fleet size and key vehicle specification requirements described in the procurement.
Minimum fleet size specifications
Not publicly available
Not specified (defined in fleet procurement – ID 401)
How the procurement defines or requires the inclusion of electric vehicles (e.g., percentage of total fleet, categories affected)
Electric requirement
—
—
Warranty requirements for vehicles, batteries, or systems when disclosed.
Warranty requirements
Not publicly available
Not applicable to operation procurement
Main source of CAPEX payment or revenue in the contractual arrangement.
CAPEX payment or revenue source
Private operator, but SPTrans subsidizes a percentage equivalent to the difference in value between a diesel bus and an electric bus.
Not applicable (CAPEX handled via separate fleet procurement)
CAPEX payment or revenue values and units disclosed in the procurement.
CAPEX payment or revenue values
Internal Rate of Return (IRR) of 9.1% on invested capital*
Not applicable
How residual value risk of assets is allocated among stakeholders.
Asset residual value risk allocation*
Private fleet provider (inferred)
Public authority (inferred)
How battery degradation risk is allocated among stakeholders.
Battery degradation risk allocation*
Private fleet provider (inferred)
Public authority (inferred)
Primary source of financing for the fleet or infrastructure investments.
Source of financing*
Shared (private and public)
Operator (inferred)
Currency denomination and risk-sharing structure for payments or contracts.
Currency exposure structure*
Not specified (likely local currency – R$/BRL)
Not specified
OPEX & Operational Structure
Country name
Country
#SP
Brazil
#402
Brazil
City or metropolitan region where the procurement process applies.
City / Region
#SP
São Paulo
#402
Belém
Main source of OPEX payment or revenue in the contractual arrangement.
OPEX payment or revenue source
#SP
Public payment (gross cost contract – operator paid per km, revenue centrally collected)
#402
Public remuneration per passenger transported
OPEX payment or revenue values and units disclosed in the procurement.
OPEX payment or revenue values
#SP
Defined as R$/km (remuneration fare), periodically adjusted; varies by fleet type and cost structure
#402
Maximum reference remuneration of BRL 3.76 per passenger transported
Requirement for air conditioning in the vehicles, if specified
Air conditioning requirement
#SP
Required (inferred)
#402
Not required
Minimum technical requirements for batteries and charging systems: autonomy, charging time, and charging type (slow, opportunity)
Battery charging specifications
#SP
Not publicly available
#402
Not publicly available
How energy price risk is allocated among stakeholders.
Energy price risk allocation*
#SP
Operator bears energy price risk (inferred)
#402
Not publicly available
Charging model adopted in the procurement (e.g., depot charging, opportunity charging).
Charging model type*
#SP
Energy-as-a-service model: a private provider installs and operates charging infrastructure in operator depots, with service payments structured under public financing mechanisms.
#402
Public infrastructure model: charging infrastructure publicly provided; operator uses system without CAPEX responsibility
City or metropolitan region where the procurement process applies.
City / Region
São Paulo
Belém
Main source of OPEX payment or revenue in the contractual arrangement.
OPEX payment or revenue source
Public payment (gross cost contract – operator paid per km, revenue centrally collected)
Public remuneration per passenger transported
OPEX payment or revenue values and units disclosed in the procurement.
OPEX payment or revenue values
Defined as R$/km (remuneration fare), periodically adjusted; varies by fleet type and cost structure
Maximum reference remuneration of BRL 3.76 per passenger transported
Requirement for air conditioning in the vehicles, if specified
Air conditioning requirement
Required (inferred)
Not required
Minimum technical requirements for batteries and charging systems: autonomy, charging time, and charging type (slow, opportunity)
Battery charging specifications
Not publicly available
Not publicly available
How energy price risk is allocated among stakeholders.
Energy price risk allocation*
Operator bears energy price risk (inferred)
Not publicly available
Charging model adopted in the procurement (e.g., depot charging, opportunity charging).
Charging model type*
Energy-as-a-service model: a private provider installs and operates charging infrastructure in operator depots, with service payments structured under public financing mechanisms.
Public infrastructure model: charging infrastructure publicly provided; operator uses system without CAPEX responsibility