Business model: (1) single private operator; (2) dual private actor; (3) public ownership, private operation; (4) fully public operator
Business model typology
Fully private operation
Dual private actor
Publication year of the procurement process
Year
2019
2019
Institution responsible for issuing the procurement process.
Issuing authority
São Paulo Transporte S/A
DTPM + Ministry of Transport and Telecommunications
City or metropolitan region where the procurement process applies.
City / Region
São Paulo
Santiago
Entity responsible for provision of bus fleet
Fleet provision
Private operator
Private fleet provider
Entity responsible for operating public transport services.
Operation
Private operator
Private operator
Entity responsible for charging infrastructure deployment and operation.
Charging infrastructure
Private asset provider (i.e., energy as a service provider) installs under public financing
Fleet provider installs; upgrades possible (system-financed)
Entity responsible for terminals and depots (ownership, upgrades, or operation).
Terminal and depot
Private operator owns terminals and depots
Provided by DTPM
Entity responsible for fleet maintenance.
Maintenance
Operator responsible under fleet provider supervision
Same
Distribution of functional responsibilities among actors involved in the model.
Functional role distribution*
Fully integrated private model (private operator procures, owns and operates fleet)
Unbundled model (fleet provider, operator and authority with distinct roles)
How electrification is phased or structured over time in the procurement design.
Electrification trajectory design*
Fully integrated private model (private operator procures, owns and operates fleet)
Unbundled model (fleet provider, operator and authority with distinct roles)
CAPEX Structure
Country name
Country
#SP
Brazil
#204
Chile
City or metropolitan region where the procurement process applies.
City / Region
#SP
São Paulo
#204
Santiago
Minimum fleet size and key vehicle specification requirements described in the procurement.
Minimum fleet size specifications
#SP
Not publicly available
#204
300 / 1,370 / 360 vehicles by size
How the procurement defines or requires the inclusion of electric vehicles (e.g., percentage of total fleet, categories affected)
Electric requirement
#SP
—
#204
—
Warranty requirements for vehicles, batteries, or systems when disclosed.
Warranty requirements
#SP
Not publicly available
#204
Not publicly disclosed
Main source of CAPEX payment or revenue in the contractual arrangement.
CAPEX payment or revenue source
#SP
Private operator, but SPTrans subsidizes a percentage equivalent to the difference in value between a diesel bus and an electric bus.
#204
Public remuneration per: vehicle acquisition; maintenance compliance certification
CAPEX payment or revenue values and units disclosed in the procurement.
CAPEX payment or revenue values
#SP
Internal Rate of Return (IRR) of 9.1% on invested capital*
#204
Unspecified; defined by bidders as part of their economic proposal. Electric buses are paid in 168 monthly installments, and diesel buses in 120. Number of installments determines contract duration
How residual value risk of assets is allocated among stakeholders.
Asset residual value risk allocation*
#SP
Private fleet provider (inferred)
#204
Private fleet provider (inferred)
How battery degradation risk is allocated among stakeholders.
Battery degradation risk allocation*
#SP
Private fleet provider (inferred)
#204
Private fleet provider (inferred)
Primary source of financing for the fleet or infrastructure investments.
Source of financing*
#SP
Shared (private and public)
#204
Operator (inferred)
Currency denomination and risk-sharing structure for payments or contracts.
City or metropolitan region where the procurement process applies.
City / Region
São Paulo
Santiago
Minimum fleet size and key vehicle specification requirements described in the procurement.
Minimum fleet size specifications
Not publicly available
300 / 1,370 / 360 vehicles by size
How the procurement defines or requires the inclusion of electric vehicles (e.g., percentage of total fleet, categories affected)
Electric requirement
—
—
Warranty requirements for vehicles, batteries, or systems when disclosed.
Warranty requirements
Not publicly available
Not publicly disclosed
Main source of CAPEX payment or revenue in the contractual arrangement.
CAPEX payment or revenue source
Private operator, but SPTrans subsidizes a percentage equivalent to the difference in value between a diesel bus and an electric bus.
Public remuneration per: vehicle acquisition; maintenance compliance certification
CAPEX payment or revenue values and units disclosed in the procurement.
CAPEX payment or revenue values
Internal Rate of Return (IRR) of 9.1% on invested capital*
Unspecified; defined by bidders as part of their economic proposal. Electric buses are paid in 168 monthly installments, and diesel buses in 120. Number of installments determines contract duration
How residual value risk of assets is allocated among stakeholders.
Asset residual value risk allocation*
Private fleet provider (inferred)
Private fleet provider (inferred)
How battery degradation risk is allocated among stakeholders.
Battery degradation risk allocation*
Private fleet provider (inferred)
Private fleet provider (inferred)
Primary source of financing for the fleet or infrastructure investments.
Source of financing*
Shared (private and public)
Operator (inferred)
Currency denomination and risk-sharing structure for payments or contracts.
Currency exposure structure*
Not specified (likely local currency – R$/BRL)
Not publicly available
OPEX & Operational Structure
Country name
Country
#SP
Brazil
#204
Chile
City or metropolitan region where the procurement process applies.
City / Region
#SP
São Paulo
#204
Santiago
Main source of OPEX payment or revenue in the contractual arrangement.
OPEX payment or revenue source
#SP
Public payment (gross cost contract – operator paid per km, revenue centrally collected)
#204
Not applicable
OPEX payment or revenue values and units disclosed in the procurement.
OPEX payment or revenue values
#SP
Defined as R$/km (remuneration fare), periodically adjusted; varies by fleet type and cost structure
#204
Unspecified; defined by bidders as part of their economic proposal. Electric buses are paid in 168 monthly installments, and diesel buses in 120. Number of installments determines contract duration
Requirement for air conditioning in the vehicles, if specified
Air conditioning requirement
#SP
Required (inferred)
#204
Recommended
Minimum technical requirements for batteries and charging systems: autonomy, charging time, and charging type (slow, opportunity)
Battery charging specifications
#SP
Not publicly available
#204
215 km / 50 km; 5h / 9 min
How energy price risk is allocated among stakeholders.
Energy price risk allocation*
#SP
Operator bears energy price risk (inferred)
#204
Operator bears energy price risk (not explicitly specified; inferred from model structure)
Charging model adopted in the procurement (e.g., depot charging, opportunity charging).
Charging model type*
#SP
Energy-as-a-service model: a private provider installs and operates charging infrastructure in operator depots, with service payments structured under public financing mechanisms.
#204
Operator / supplier-led charging model (infrastructure proposed by bidders and installed in public terminals; compensated via dedicated payment component)
City or metropolitan region where the procurement process applies.
City / Region
São Paulo
Santiago
Main source of OPEX payment or revenue in the contractual arrangement.
OPEX payment or revenue source
Public payment (gross cost contract – operator paid per km, revenue centrally collected)
Not applicable
OPEX payment or revenue values and units disclosed in the procurement.
OPEX payment or revenue values
Defined as R$/km (remuneration fare), periodically adjusted; varies by fleet type and cost structure
Unspecified; defined by bidders as part of their economic proposal. Electric buses are paid in 168 monthly installments, and diesel buses in 120. Number of installments determines contract duration
Requirement for air conditioning in the vehicles, if specified
Air conditioning requirement
Required (inferred)
Recommended
Minimum technical requirements for batteries and charging systems: autonomy, charging time, and charging type (slow, opportunity)
Battery charging specifications
Not publicly available
215 km / 50 km; 5h / 9 min
How energy price risk is allocated among stakeholders.
Energy price risk allocation*
Operator bears energy price risk (inferred)
Operator bears energy price risk (not explicitly specified; inferred from model structure)
Charging model adopted in the procurement (e.g., depot charging, opportunity charging).
Charging model type*
Energy-as-a-service model: a private provider installs and operates charging infrastructure in operator depots, with service payments structured under public financing mechanisms.
Operator / supplier-led charging model (infrastructure proposed by bidders and installed in public terminals; compensated via dedicated payment component)